Pile Fabrication & Installation

Projects Name :

1- Pier construction

2-  Construction of dry dock

3-  Construction and erection of light jetty

4-  Construction of Skid Ways and Quay Wall

Year: 2013 – 2015

Quantity: 35,000 Nos.

Scope of Works:

Hydraulic structure construction for the development plans including pier, skidways , quaywalls, dry dock, jetty and related

We are able to fabricate 100 piles per day

  • Soil Mechanic & Concrete test Labratory
  • 12000m2 space for fabrication and storage
  • Heavy machinery for fabrication, transportation and installation
  • Stored material for keep projects on track
  • Pro quality Control and approved procedures
  • Fabricating 100 piles per day for Abadan Refinery. This project consist of :
  • Soil mechanic & concrete test laboratory
  • 12000 space for fabrication and storage
  • Heavy machinery for fabrication, transportation and installation
  • Stored material for keeping projects on track
  • Pro quality control and approved procedures

Synchrolift is an instrument for docking and undocking vessels.

Its mechanism is exactly like an elevator which moves a platform via powerful electrical winches. Synchrolift moves vessels in a similar process.

The company's Syncrolift project is in operation, which will be operational by 2020

  • South Pars Gas Field Development Phases 6,7,8,9,10,12,13,5,16,19,20 & 21 (as Shipment, Pile transportation, Coating pipes, Platform transportation, Jacket installation and piling and Drilling well services for I.O.E.C)

 

  • Farzad Oil Field (as drilling wells services in PETROPARS Ltd)

 

  • Al Khalij Oil Field (as shipment of jacket in Qatar Petroleum)

 

  • Hengam, Salman & Forouzan Oil Field (as logistic & well services in Petro Iran);